Balloch Bridge
-
Sector
Bridges
-
Duration
8 Weeks
-
Location
Balloch, Dumbartonshire
-
Form of Contract
-
Overview
Britcon Engineering Services involvement in this contract comprised the design, fabrication, delivery and erection of a three span bridge deck across the River Leven in Dumbartonshire.
The project involved removal and replacement of the original five span bridge with a new deck incorporating cantilevered outboard pedestrian walkways.
A separate contract was undertaken for specialist handrailing systems for the bridge.