Caistor Grammar School

  • Sector

    Education

  • Duration

    24 Weeks

  • Location

    Caistor

  • Form of Contract

  • Overview

The scheme comprised the extension and remodelling of the existing music accommodation together with the construction of a new food technology teaching facility.

The work included the construction of a new single storey steel framed extension to an existing 3 storey block with some internal remodelling works. The structure comprised a ring beam supported from piled foundations with a beam and block floor. Significant associated mechanical / electrical and external infrastructure works were required to meet the demands of the new Food Technology facility.