Total Lindsey Oil Refinery
-
Energy
Sector
-
35 Weeks
Duration
-
North Killingholme
Location
-
Form of Contract
-
Overview
Britcon (UK) Limited recently completed civil engineering works for the project known as OSBL - Outside Battery Limits project associated with the new HDS3 facility at Linsdey Oil Refinery (LOR) Killingholme.
The works included the design, fabrication and installation of modifications and alterations to existing pipe bridges and structures and the construction of new pipe bridges and structures, foundations for new equipment, modifications to existing buildings, construction of new buildings, formation of concrete cable ducts etc.